It started with a temperature complaint—and my wrong assumption

On January 17, 2024, I got a call from a food distributor in central Ohio. We'd finished a 60,000-cubic-foot walk-in cooler and freezer for them three weeks earlier. The complaint was specific: product near the main door was running about 4°F warmer than the setpoint during peak loading hours.

My first reaction wasn't exactly calm. We'd specified Bohn refrigeration equipment for the whole project—Bohn evaporators in the cooler and freezer, a Bohn condenser on the roof, and a Bohn compressor rack. I've reviewed 200+ equipment specs annually for the last four years, and Bohn units have never been the weak link. So when the customer said "your Bohn equipment isn't holding temperature," I assumed—wrongly—that something in the Bohn delivery was off.

That's the first thing I'd flag for anyone specifying commercial refrigeration: the equipment can meet every spec on the submittal and the room can still fail. I assumed "Bohn specs met" equaled "room performs." It doesn't. Not even close.

The site visit: what the Bohn units were actually doing

I sent our lead technician out on January 22. He spent two days logging data—supply air temperature, return air temperature, defrost cycles, door openings, and air velocity at six points across the cooler.

The Bohn evaporator was discharging at the design TD. The Bohn compressor was pulling the right suction pressure. The condenser was clean and the ambient was within spec. Every piece of Bohn refrigeration equipment was doing exactly what the cut sheets said it would.

What wasn't doing its job: the air distribution. The cooler had a 10-foot ceiling and pallet racking that went up to 9 feet. The Bohn evaporator was mounted center-ceiling, blowing straight down. Product near the door—where the racking was lower and warm air infiltrated every time the door opened—never got adequate airflow.

"The equipment was fine. The room was fine. The interface between them wasn't."

That's a frustrating thing to explain to a customer who just spent six figures. I've had mixed feelings about this project ever since. On one hand, I was relieved no Bohn component failed. On the other, I was embarrassed that we'd treated air circulation as a given.

The Vornado fan fix—and why I should've specified it upfront

We added two Vornado fans—the 683DC model—mounted on the side walls at 7 feet, angled down toward the door zone. These are circulation fans, not evaporator fans. They move high-volume air at low velocity, which is exactly what you want in a cooler with tall racking and frequent door openings. They don't fight the Bohn evaporator's discharge pattern—they supplement it.

Within 72 hours, the temperature spread across the room tightened from 5°F to 1.5°F. The customer stopped calling.

Here's what bothers me: I'd specified Vornado fans on three other projects in 2023. I knew they worked. But on this job, the drawings showed a Bohn evaporator centrally located and I just assumed the throw pattern would cover the room. I assumed. Didn't verify. Turned out the pallet racking and door traffic created a dead zone that no center-mounted unit could reach alone.

Lesson learned: every cold room spec now includes an air circulation note. If racking exceeds 6 feet and there's a high-traffic door, we budget for circulation fans—Vornado or equivalent—from day one. Not as an afterthought.

The boiler installation curveball

While we were wrapping up the cooler fix, the customer asked about heating the adjacent prep room. They wanted a boiler installation—a small gas-fired unit for washdown water and space heating.

I don't do boilers. But I know enough to know that boiler installation in a food facility isn't just about the boiler. It's about venting, combustion air, and—critically—the exhaust path. The mechanical contractor they hired specified a Can Fan for the flue draft. The model they picked was rated for 400 CFM at 0.5" static pressure.

The problem: the actual duct run had four elbows, 22 feet of horizontal run, and a termination hood that added significant resistance. By my rough calculation—and I'm not an engineer, so take this with a grain of salt—the system needed closer to 0.9" static pressure at 400 CFM. The Can Fan they selected was undersized for the installed configuration.

The boiler short-cycled for two days before the contractor figured it out. They swapped to a larger Can Fan model and the problem went away. But it cost the customer an extra $1,800 in parts and labor—and delayed their prep room opening by four days.

That one wasn't my project, technically. But I reviewed the submittal and missed it. I saw "Can Fan—400 CFM" and assumed the contractor had done the static pressure calculation. I didn't ask for the duct layout until after the fact.

What I changed in our quality protocol

After this project—which was really three projects in one—I revised our internal review checklist. Three changes:

  1. Air circulation is now a line item. Any cooler or freezer with racking over 6 feet or a door cycle over 10 openings per hour gets a circulation fan evaluation. Vornado units are our default reference, but we'll accept equivalent. The point is: someone looks at the room, not just the Bohn equipment schedule.
  2. Static pressure calculations are required for any fan submittal. If it's a Can Fan, a Vornado fan, or any other air mover, I want to see the calculation, not just the CFM rating. That boiler installation delay cost the customer time they didn't get back.
  3. I stopped assuming "spec met" equals "system works." This sounds obvious. It isn't. When you review 200+ submittals a year, it's easy to check boxes and move on. The Bohn compressor was within spec, the Bohn evaporators were within spec, the condenser was within spec—and the room still failed. Because the spec doesn't cover how the pieces interact.

The honest takeaway

I have mixed feelings about how this one played out. Part of me thinks we got lucky—the fix was cheap and fast. Another part knows we shouldn't have needed the fix at all.

If you're specifying Bohn refrigeration equipment or any other commercial refrigeration system, here's what I'd tell you: the equipment schedule is the beginning of the conversation, not the end. Ask how the air moves. Ask who calculated the static pressure. Ask what happens at the door when the room is full and the outside temp is 95°F.

An informed customer asks better questions. That's not me being patronizing—it's me being honest about what I've missed myself. The best project reviews I've been part of are the ones where the customer pushed back and said, "Walk me through how this actually works in my building."

That question would've saved everyone a January phone call in 2024.

author avatar
Gavin Mercer

Gavin Mercer covers plate, shell-and-tube, brazed-plate, and finned heat exchangers together with cooling towers, dry coolers, and evaporative fluid coolers. He applies ASME BPVC Section VIII and PED 2014/68/EU considerations while examining LMTD, overall heat-transfer coefficient, pressure drop, fouling allowance, design pressure, and approach temperature. His work guides thermal engineers and procurement teams through duty verification, material selection, cleanability, water quality, corrosion risk, and total installed cost.

Leave a Reply

Your email address will not be published. Required fields are marked *